The industrial park of our town offers advantage for investments requiring public utlity works and for investments in the reutilization of landed property. Its geographical setting is ideal, and has good connexions in every direction. These advantages will show up in relation to both transportation and workforce. Well trained, highly skilled professional workers await here new jobs and are also possible subjects for to be trained to a new profession.
An advanced infrastructure is at hand which allows for a wide range of energy sources and cultivated work. You can access all kinds economical, legal, financial, trading and banking sevices in Oroszlány as well.

Foreign enterpreneurs will also find favourable conditions for economical management. The guarnties for this are the liberal investment policies, the effectively convertible currency, the possibility of 100% foreign ownership, the tax allowances, the liberalsed foreign trade, the protection of investments based on inter-state treaties and contracts serving to avoid double taxation.



The Industrial Park I. is designed in the first place for middle-sized enterprises and is suitable for green-field investments. There is a possibility of lining out building sites - which are extending over half a hectar- in the area, at a favourable price. The area offers good soil conditions.

Main parts of infrastructure:
Electric power:3 MW via 3 cableloops,
Thermal energy:150/70 C heatstepping primer system up to 5-6 MW capacity,
Water supply:satisfies all needs via the NA 300 mm main pipe,
Telecomunication:approximately 1000 free main lines, digital subsystems.

Maximum noise level allowed: 60 dB daytime, 50dB nighttime.




At the place of the former mining company tehre is a 27 ha area waiting for reutilization in Industrial Park II. There is also the possibility of green field investments. The area offers good soil conditions. There is a possibility of lining out building sites that extend over half an acre, and the already existing industrial buildings are subject to further utilization.

Main parts of infrastructure:
Electric power:35 kW transformer, 6kV loop division,
Thermal energy:150/70 C heatstepping primer system up to 2-3 MW capacity,
Water supply:satisfies all needs from the 200 m3 hydroglobe,
Telecomunication:approximately 1000 free main lines, digital subsystems.

Maximum noise level allowed:50 dB daytime, 40dB nighttime.